Skip to main content
Architectural photograph of the completed NH-52 (4-Lane) bridge section in Assam, India. Focus on the bridge's structural integrity and modern design. Lush green Assamese landscape in the background, showcasing the surrounding environment. Capture the scene during golden hour, with warm, diffused sunlight highlighting the bridge's concrete and steel elements. Employ a long lens to compress perspective and emphasize the bridge's length. Capture the details of the bridge structure. Ensure clarity and sharpness, suitable for an architecture portfolio.. Professional architectural photography, ultra-high quality, sharp focus, vivid colors, dramatic lighting, golden hour, cinematic composition, 8K UHD, photorealistic.
Back to Projects

NH-52 Section (4-Lane)

Assam2025Bridges & Structures

Overview

NH-52 Nh- (4-lane). Bridges & Structures. located in Assam. for PWD, Assam. (₹ 273.90 Crore)

Project Details

Full project name: Construction of a 4-Lane Flyover at Mission Chariali, Tezpur, Junction point of Nh-52(New NH-52) at Ch. Km 134.50, NH-37A at Ch. 23.130 and other urban Arterial road under SOPD under Nagaon NH Division on EPC Mode.

NH-52 Nh- (4-lane). Bridges & Structures. located in Assam. for PWD, Assam. (₹ 273.90 Crore)

Location: Assam. Client: PWD, Assam.

Project Highlights

  • Client: PWD, Assam
  • Bridges & Structures
  • Highway/expressway development
  • EPC mode
  • National Highway project